Use & Occupancy Requirements
Public Sewer District Resale Requirement (Residential AND Non-Residential):
For property owners (both residential and non-residential) in the Public Sewer District, there is a mandatory resale requirement to have your connection (sometimes called a lateral or building sewer) televised and cross-connections inspected by the Township. Property owners are REQUIRED to notify the Township at least 30 days prior to selling their house/dwelling/building to complete this requirement. This will give you enough time to make any repairs (if needed) before the settlement date.
Cross Connection & Televising -For a property that has NOT received a televising witnessed by the Township within the last 5 years prior to the current date of resale, a cross connection & televising inspection is required.
The cross-connection inspection will need to be completed by the Township Inspector, Linn Architects. Our inspector will need to have access to the inside of the house/dwelling/building. The televising of the sewer line will need to be completed by a contractor that the homeowner hires.
Once the Township receives the permit application and fee, the owner/agent will call the contractor to set up an appointment to conduct the televising. The owner/agent will also need to contact the Township inspector to set up the cross-connection inspection. Please have someone available at the property to let the inspector into the house/dwelling/building for the inspection.
The Township inspector does not have to witness the televising of the line, but the Township will need a thumb drive or a copy of the televising for our inspector to review (we cannot accept anything on YouTube). Please email the televising to Edgmontadmin@edgmont.org. A copy of the televising must be provided to the Township upon completion & prior to a Certificate of Compliance being issued. The permit cost is $250.00 and the application link is below.